Everything included
Your basement permit package.
Everything we prepare and do to get your basement development permitted.
The drawings
The drawings your project needs depend on your answers and your municipality. Here is what each one shows and why it matters.
- Basement floor plan, existing and proposed. The basement as it is today and as it will be: rooms, walls, doors, stairs, mechanical room and window locations.
- Construction notes. Wall assemblies, insulation, fire safety, smoke and carbon monoxide alarm locations, and ventilation notes.
- Site plan (when windows are added). Your lot and house, showing where new or enlarged windows and window wells are located.
- Elevations with glazing calculation (when windows are added). Each side of the house that gets a new window, with the window size checked against the building code.
Every step we handle
1. Information collection and initial zoning review
- We review your Real Property Report (RPR) or survey, photos and project details.
- We check the zoning bylaw that applies to your property: setbacks, lot coverage, height and use.
- We confirm which permits your project needs and flag anything that could trigger a development permit.
- For existing work and interior projects, our technician visits to measure and photograph what is there.
2. Drawings
- We prepare every drawing listed below, to the standard your municipality expects.
- You receive a draft to review and approve before anything is submitted.
- One round of revisions is included.
- Our team checks the package internally before it goes to you, so the municipality has fewer questions.
3. Permit submission and management
- We prepare the application forms and upload everything through the municipal portal.
- We coordinate payment of the municipal fees.
- We answer the municipality's questions and handle requested changes, with your approval.
- You get a weekly update from your project manager until the permit is issued.
- When your permit is issued, we send it with the permit conditions explained and step by step instructions for booking inspections.
What we need from you
- A rough sketch or description of the layout you want
- Which rooms will be bedrooms
- Your RPR, if windows will be added
One point of contact
Your project manager stays with your file from the first review to the issued permit, and sends you an update every week.