Everything included
Your deck permit package.
Everything we prepare and do to get your deck permit issued.
The drawings
The drawings your project needs depend on your answers and your municipality. Here is what each one shows and why it matters.
- Site plan. Your lot, the house and the deck, with the distances to every property line so the municipality can confirm the setbacks.
- Deck plan. The deck seen from above: size, joist and beam layout, post locations, stairs and guards. Two level decks get a plan for each level.
- Deck section. The deck cut through from the side: footing depth below frost, posts, beams, joists, decking and guard height.
- Construction details. How the deck connects to the house, footing and post connections, stair dimensions and guard details.
- Elevations (covered decks). For decks with a roof, pergola or canopy, the sides of the structure showing the roof and supports.
Every step we handle
1. Information collection and initial zoning review
- We review your Real Property Report (RPR) or survey, photos and project details.
- We check the zoning bylaw that applies to your property: setbacks, lot coverage, height and use.
- We confirm which permits your project needs and flag anything that could trigger a development permit.
- For existing work and interior projects, our technician visits to measure and photograph what is there.
2. Drawings
- We prepare every drawing listed below, to the standard your municipality expects.
- You receive a draft to review and approve before anything is submitted.
- One round of revisions is included.
- Our team checks the package internally before it goes to you, so the municipality has fewer questions.
3. Permit submission and management
- We prepare the application forms and upload everything through the municipal portal.
- We coordinate payment of the municipal fees.
- We answer the municipality's questions and handle requested changes, with your approval.
- You get a weekly update from your project manager until the permit is issued.
- When your permit is issued, we send it with the permit conditions explained and step by step instructions for booking inspections.
What we need from you
- Your RPR or survey plan
- The deck's size and height
- Whether it will be covered or have a hot tub
- Photos, if the deck already exists
One point of contact
Your project manager stays with your file from the first review to the issued permit, and sends you an update every week.